Yayla Regulator and HEPP

The Yayla Regulator and HEPP, established in 2013, are located on the Murgul River in the Murgul district of ARTVİN province. The power plant has a total of 6,787 m of water transmission lines and is connected to the electricity grid from the power plant distribution level.

  • Yayla Regulator Hydroelectric Power Plant
  • Installed
    Power 4,67 MWe
  • Generation
    Capacity 17 GWh
Yayla Regulator and HEPP
Yayla Regulator and HEPP